Where the Burt Lake Trail Stands This Winter, Mile by Mile

November 19, 2026

About a mile of west-side trail changed in late October. Roughly 0.8 mile of the Burt Lake Trail running south from Hogsback Road now has asphalt on it. The paving was finished about October 22. A shorter stretch, from Harwood Road north past Indian Road, will stay on its stone base until spring. Burt Township's Trail Committee recorded both decisions at its October 26 meeting.

That leaves the 11.4-mile route in a different state than its own planning documents describe. It also changes how you might use it between now and the thaw. The trail is non-motorized and free, and the township lists cross-country skiers and snowshoers among its users along with walkers, runners, cyclists and equestrians. So the useful winter question is which stretch you're on and where you can get on and off.

The new asphalt south of Hogsback Road

The township's 2026–2031 Master Plan was adopted by the Township Board on August 6. It says the remaining 1.5 miles of west-side stone "will be resurfaced in 2026." By the board's October 1 meeting, the committee reported that half a mile of paved trail had been destroyed in the flooding and road damage, and that the full 1.5 miles would not be done this year.

Three weeks later, committee chair Gene Hodulik and contractor Mike Spierling had settled on a smaller job. They would pave the part that was ready. The committee minutes give the reasoning in one line:

"This portion has a very solid base."

That stretch runs about 0.8 mile south from Hogsback Road and stops at a tenth of a mile that was already paved. The minutes say the paving was done four days before the October 26 meeting. So the newest asphalt on the trail is less than a month old as winter starts.

The route from Maple Bay to Hoppies

The township's planning documents describe the trail as a chain of phases built over more than a decade. The Recreation Plan names the endpoints as Maple Bay on the west and Hoppies, the public access on Mullett-Burt Road, on the east. Going from west to east, each stretch looks like this right now:

  1. Maple Bay Road to Hogsback Road. This was Phase I, built in 2013, mostly as a 10-foot crushed limestone path. Since 2022 it has been paved in half-mile segments. This fall's 0.8 mile from Hogsback south is the latest segment. The stretch from Harwood Road north past Indian Road is still stone.
  2. Hogsback Road along Riggsville Road to East Burt Lake Road. Phase II is 1.8 miles of asphalt trail separated from the road, finished in May 2020 with MDOT and DNR Trust Fund grants plus donor match money.
  3. Through University of Michigan Biological Station land to East Burt Lake Road and Birchwood Road. Phase III was finished in 2021. The township began easement talks with UMBS in 2015.
  4. East Burt Lake Road. Phase IV runs about 1.5 miles on widened five-foot paved shoulders, built in 2020 with the Cheboygan County Road Commission.
  5. Mullett-Burt Road to Hoppies. Phase V is another 1.5 miles of paved shoulder, widened in 2017.

So the trail feels different depending on where you are. On Riggsville Road and through the UMBS woods, you're on dedicated trail away from cars. On the east side, it shares the shoulder of the road. The whole west side, including this fall's new asphalt and the stone stretch still waiting, was built as a 10-foot path.

The stone stretch near Indian Road, and what has to happen in spring

The roughly 0.7 mile from Harwood Road north past Indian Road has a damaged base. Spierling's crew had too much other work to repair it before the season closed. The plan the committee agreed to is to repair the base next spring and then pave. The minutes note that this is "a change to what was agreed to a month ago."

A design question also has to be settled before that asphalt goes down. The old section of West Burt Lake Road is two feet or more narrower than the newly paved section. If the trail is built right against the road, it needs to be 11 to 12 feet wide, and the committee wants the county road commission to pay for the extra width. The committee's own preference is a trail separated from the road, as it was designed. If the trail ends up beside the shoulder, the minutes call for painted fog lines and suggest rumble strips or reflective stakes like those used on curves.

For a walker or skier this winter, that means one short stone section between Harwood and Indian Road, with paved trail on either side.

Where to get on the trail in winter

Most of the trail's winter value sits at its ends and in the woods near its middle. The trail itself has no parking, and the township is clear on that point. So the places to start are the lots and public access points along the way.

Maple Bay, on the west shore

The DNR describes Maple Bay State Forest Campground as a rustic campground on Burt Lake's west side, with boat access, a sandy shoreline and a large day-use lot right next to it. The township's master plan lists the Maple Bay Road public access as an ice fishing access point in winter. One caution: the DNR says roads at state forest campgrounds may not be plowed in winter.

Chaboiganing and Indian Point, the ski woods

The best winter stop on the trail is a pair of neighboring properties. Little Traverse Conservancy owns the 194-acre Chaboiganing Nature Preserve, listed at 10251 Brutus Road. Right next to it is Indian Point Memorial Forest, 290 acres owned by UMBS. Together they have more than 2.5 miles of easy trails for hiking and skiing. The Burt Lake Trail runs past both, with a parking lot between them, across from the old Burt Lake Market. Dogs must be leashed, and the conservancy notes that hunting is allowed on Indian Point. The township's Recreation Plan lists the Chaboiganing lot as having room for 12 cars and a bus, including two accessible spaces.

The UMBS crossing

When the trail crosses Biological Station land, the station's property rules apply. The property is open sunrise to sunset, pets must be leashed, and visitors are asked to stay on the trails so they don't disturb research. UMBS welcomes the public on its own ski trails. In a January 2025 news release, the station said it had several miles of groomed trails open to the public.

Hoppies, on Mullett-Burt Road

At the east end, the master plan lists Hoppies as a public access with expanded parking for summer use and as an ice fishing access. A permanent east-side trailhead is planned on the township-owned lot at Crump Road and Mullett-Burt Road, but it won't be built this winter. EGLE told the committee it will drill three or four new wells on that property next spring. That pushes the stone surface and split-rail fence to May or June. The committee has already approved a $3,676 quote for the fence. The township got the lot for one dollar, and the committee has suggested recognizing the seller at the trailhead.

What the committee has planned for 2027

The paving in spring is only one of the trail's plans for next year. The committee wants benches about every half mile, starting with at least two on each side of the lake. They might be modeled on the bench at the Gorge or on ones made by Cheboygan Cement. Becca Nelson, acting executive director of Top of Michigan Trails Council, told the committee that benches on most trails are paid for with donations and carry engraved names. The committee also suggested asking Amish builders about a sign holder and a run-in shelter for the new trailhead.

The trail's finances are steady. The township's Trail Maintenance Fund held $50,618.14 as of September 30, 2026, against $4,170 spent on trail maintenance so far this year. A separate Burt Lake Trail donation account managed by Top of Michigan Trails Council held $20,887.80 as of June 4. The council has handled the trail's donations for more than 15 years.

The longer-range goal is to connect the trail to regional trails. Those are the North Western State Trail in Brutus and the North Central State Trail in Topinabee. The master plan commits the township to working with Emmet County jurisdictions to extend the trail west to Brutus, partly on paved road shoulders. For now, cyclists heading toward either town follow signage on the connector roads. The committee was told that repaving those roads, possibly with wider paved shoulders, is still a few years away.

The committee's next meeting is Monday, November 23, at 7 p.m. at Burt Township Hall. It usually skips December, so this is the last scheduled meeting before the spring paving plan takes shape. For more about the north end of the lake, our earlier piece on the bridge that still makes Burt Lake wait covers the bays, the river mouth and the swing bridge.

Whether you're thinking about a home near Hogsback Road, a lot near the new Crump Road trailhead, or simply how close a property sits to a trail entrance, Genna Hill is glad to talk through what those changes mean for a particular address. You can start with our Burt Lake neighborhood page. Let’s Connect.

Let’s Start a Conversation

Connect with a real estate professional who values trust, insight, and personal attention. Every step is guided by a deep understanding of what “home” truly means.